Eight steps, in this order, every time.

Most people start with a suburb they like and work backwards to a budget. We do the opposite, because the budget is the only part that is not negotiable.

Check if I'm buyer readyStart my shortlist

From the first call to the three year review.

The same order every time, so you always know what happens next.

  1. Get in touch

    A call or the form. About twenty minutes, no cost and no credit check.

  2. Finance

    A licensed broker confirms what you can borrow, in writing. That number becomes your ceiling.

  3. Region review

    Roughly 15,500 suburbs are screened against your ceiling and narrowed to the regions the numbers support.

  4. Pick the area

    Tight fundamentals only. Not a thousand of the same house side by side, all doing the same thing, with high vacancy.

  5. Select the lot

    We go through the available lots with you and choose the one.

  6. Construction

    A fixed price build, managed through every stage.

  7. The right tenant

    We find the right tenant, so the property is leased from handover.

  8. Three year review

    A three year review of the property, absolutely free with our offer.

Step 2 · Finance

Borrowing capacity

Before a single suburb is discussed we establish what you can borrow and what the repayments look like at that number, including whether a construction pause is worth asking your lender about. If the answer is no, you find out in week one rather than week nine.

Indicative borrowing capacity
A written range
Repayment at each construction stage
Slab to completion
Deposit or usable equity required
A number, not a guess
Construction pause
Worth asking, or not
Credit check
None at this stage

An indicative range prepared with a broker. Not an approval, and nothing touches your credit file.

Steps 3 to 5 · Region, area, lot

The corridor the numbers support

Your capacity sets the price ceiling, and the ceiling narrows the field. We look at yield, vacancy, land size, infrastructure spend and population movement, then our team physically inspects what is left before anything reaches you.

Corridor and estate
Named, with the developer
Land status
Titled, or registration date
Rental appraisal
From a local agent, dated
Vacancy and yield
Sourced and dated
Inspection
By our team, in person

Every market figure on your shortlist names where it came from and when it was pulled. If we cannot source it, we do not put it in.

Steps 6 and 7 · Construction and tenant

Managed to a tenanted handover

Land and build contracted together at a fixed price. We manage the builder, the milestones and the defect inspection, and hand it over with a tenant in it rather than a set of keys and a phone number.

  • Land settled
  • Slab down
  • Frame up and inspected
  • Lock up
  • Fixing and fit out
  • Practical completion and defect inspection
  • Tenanted handover

Clients see this view for their own build, updated at every milestone. Example shown at lock up stage.

The twelve months that make building possible.

A construction loan draws down in stages, and you owe repayments on every stage before there is a tenant in the house. For most people that is the reason building an investment never gets off the ground.

  • What the pause actually is

    Some lenders offer arrangements that let you pause repayments for up to twelve months while your home is being built. You keep paying your own rent or mortgage, and nothing else.

  • What the pause costs you

    Interest continues to accrue during the pause and is added to your loan balance, which increases the total amount you repay over the life of the loan.

  • Who decides if you qualify

    Eligibility is assessed and determined by the lender, not by us. We can tell you whether it is worth asking the question and who to ask it of.

Step 8 · Three year review

The work does not stop at the keys. A three year review of the property is included, absolutely free with our offer.

Why we put the cost next to the benefit

A paused repayment is not a free period, and anyone presenting it as one is selling you something. Handled properly it is the difference between building an investment property and not building one. Handled badly it is a bigger loan than you planned for. You should know both halves before you decide.

Buyer ready quiz

Find out where you actually stand.

Four questions, about a minute. You get a Buyer Ready Score, the specific things standing between you and a build, and whether a construction repayment pause is worth asking your lender about. No credit check, nothing that touches your file.

A Buyer Ready Score is an indication based on what you tell us. It is not a loan approval, an offer of credit, credit assistance or financial advice. Any actual lending is assessed by a lender or a licensed credit provider.

The quiz needs JavaScript. You can call (03) 9494 3151 and we will do it on the phone.

The things people actually ask us.

Can I pause my loan repayments while my investment property is being built?

Some lenders offer arrangements that let you pause repayments for up to twelve months while your home is being built. Interest continues to accrue during the pause and is added to your loan balance, which increases the total amount you repay. Eligibility is assessed and determined by the lender, not by us.

It is useful when you would otherwise be carrying your own rent or mortgage plus a construction loan at the same time. It is a poor idea if you are already stretched, because you finish the build owing more than you borrowed. Ask your lender or broker whether you qualify and what the accrued interest adds up to over your loan term.

What is a house and land package?

A block of land and a build contract bought together as one project. In most cases they are two separate contracts signed at the same time: one to buy the land, one with the builder to construct the house on it. You settle on the land first, the build proceeds in stages, and you take possession when it is finished.

How much do I need to earn to buy an investment house and land package?

There is no single income figure, because lenders weigh your income, your existing debts, your living costs and the rent the property is expected to produce, all together. Your total debt position and your deposit usually matter more than the headline salary. The buyer ready quiz on this page will tell you which of those is the thing holding you back.

What does the $1,000 engagement fee cover?

The capacity assessment, the corridor research and the shortlist our team produces, including physically inspecting what makes the list. It is credited in full against your build if you proceed. If you do not proceed, the work is yours to keep.

Do I pay stamp duty on the whole package price?

In most states, where the land and the build are separate contracts, stamp duty is calculated on the land value rather than the combined house and land price. This is one of the structural reasons house and land can compare well against an established property at a similar total cost. Duty rules, thresholds and concessions differ by state and change from time to time, so confirm the current position for your state before you rely on it.

How long does a house and land build take?

Between six and twelve months from contract to handover for a standard single storey build on titled land, assuming no weather or trade delays. Land that is not yet titled adds the registration timeline on top of that.

Which states does Citadel Developments build in?

Every Australian state. We are not tied to one builder or one state and we hold no stock, so the corridor is chosen by what the numbers support at your price ceiling rather than by where we happen to have inventory. In practice we are active in a handful of corridors at any one time and the list changes as the data does.

What does turnkey actually include?

Turnkey means the house is complete enough to lease the day you get the keys. In our packages that covers flooring throughout, blinds, a full kitchen with appliances, driveway, fencing, letterbox, clothesline and front and rear landscaping. Check this line by line on any package you are shown, because the word is used loosely across the industry.