Two homes on one block in Victoria: the planning rules

How Victoria's planning rules treat two homes on one lot, from a permit under clause 55 to the 10 day VicSmart pathway and splitting titles, and how a small second home differs.

5 min read · By Omar De Guise, Co-Founder · Published · Updated

The short version

  • In Victoria, building two homes on one lot (a duplex or dual occupancy) always needs a planning permit in the residential zones, assessed under clause 55, the Townhouse and Low-Rise Code.
  • Since 16 October 2025, a plan for two homes on a lot that meets every listed standard can go through VicSmart, which has a 10 business day permit process and no advertising to neighbours.
  • A small second home of up to 80 square metres, from 15 October 2026, normally needs no planning permit in the residential zones on a lot of 300 square metres or more, but it cannot be split onto its own title.

What counts as two homes on one block?

There are two quite different things people mean. The first is two full homes on one lot, often called a duplex or dual occupancy, usually with the option of splitting the land into two titles later. The second is a small second home, such as a granny flat, built behind or beside an existing house and staying on the same title. Victoria's planning rules treat them very differently, so it is worth knowing which one you are planning before you talk to a builder.

Start with a Planning Property Report for the address from VicPlan. It shows the zone and any overlays, such as heritage or flooding, that change what is allowed.

Do you need a planning permit for a duplex in Victoria?

Yes. Planning Victoria says a planning permit is always required in the residential zones to build two or more dwellings on a lot. The council assesses the application under clause 55 of the planning scheme, now called the Townhouse and Low-Rise Code, which covers developments of one to three storeys.

Clause 55 now works on a deemed to comply basis. Planning Victoria explains that if a design meets a standard, the matching objective is treated as met and the council is not required to consider other policy against it. If a design meets all of the listed neighbourhood character and amenity standards, objectors lose the right to appeal to VCAT. The deemed to comply standards started on 31 March 2025 and were updated on 24 September 2026.

What is the VicSmart permit for two homes on a lot?

Since 16 October 2025, Amendment VC288 has let an application for two homes on a lot use VicSmart, the state's fast permit process, if it meets every listed standard. Planning Victoria says a VicSmart application can be approved within 10 business days instead of the usual 60 day statutory timeframe, is not advertised to neighbours, and is decided by the council's chief executive or a delegate.

  • Where it applies: the General Residential, Neighbourhood Residential, Residential Growth, Housing Choice and Transport, Mixed Use and Township zones. It does not apply in the Low Density Residential Zone.
  • What it covers: building two dwellings on a lot, building a second dwelling where there is one already, and extending a dwelling where there are two.
  • What it must meet: the clause 55 standards for street setback, building height, side and rear setbacks, walls on boundaries, site coverage, access, tree canopy and front fences, plus daylight to existing windows, north facing windows, overshadowing, overlooking and overshadowing of solar panels.
  • What can rule it out: other controls on the land, such as heritage or flooding overlays, may mean the application is not eligible for VicSmart and goes through the standard process instead.

Can you split the block into two titles?

Often, yes. Under the same amendment, once a planning permit has been issued for up to two dwellings and has not expired, a two lot subdivision where each lot holds one of those dwellings can also use VicSmart in the residential zones listed above. A separate VicSmart class covers some two lot subdivisions that create a vacant lot. A licensed surveyor and the council handle the subdivision itself, and your conveyancer handles the titles.

What about a granny flat or small second home?

A small second home, called a small second dwelling in the planning scheme, is a self contained home of up to 80 square metres (from 15 October 2026) on the same lot as an existing house. It normally needs no planning permit in the residential zones on a lot of 300 square metres or more, always needs a building permit, and cannot be put on its own title. The details, including renting one out, are on our granny flats in Victoria page.

What should you check before you buy a block for two homes?

  • The zone and overlays on VicPlan, and whether the lot is in one of the zones where VicSmart applies.
  • Restrictive covenants on the title. Planning Victoria notes a covenant is a private agreement between landowners that can limit how land is used and developed, and that councils do not create or enforce them. Your conveyancer can check the title.
  • Section 173 agreements. These can set conditions or restrictions on how the land is developed. A new estate may also have its own design guidelines, so ask the developer what they allow.
  • Trees. A planning permit may be needed to remove a canopy tree.
  • Services. Ask the water, power and gas providers whether a second home can use the existing connections and whether fees apply.
  • Width and depth. Setbacks, site coverage and access standards decide how much house fits, so have a builder test a design on the actual lot before you commit.

Planning a duplex?

A duplex is the most common way to put two homes on one block. How the build, the costs and the two titles fit together, including duplex house and land packages and knockdown and build two, is on our duplex builds in Melbourne page. If you are replacing an existing house, the demolition steps are in knockdown rebuild in Melbourne.

Where Citadel Developments fits

Citadel Developments is not a builder, a planner or a surveyor. We help people building a new home in Melbourne find a registered builder and a lot that suits the plan, and we keep the build and finance timeline in step. Planning advice comes from the council and a town planner, and title work from a licensed surveyor and conveyancer. If you are weighing up two homes on one block, the short questionnaire takes about a minute.

Questions and answers

Do I need a planning permit to build a duplex in Victoria?

Yes. Planning Victoria says a planning permit is always required in the residential zones to build two or more dwellings on a lot. The council assesses it under clause 55, the Townhouse and Low-Rise Code.

How fast is a VicSmart permit for two homes on a lot?

Planning Victoria says an eligible VicSmart application can be approved within 10 business days, compared with the usual 60 day statutory timeframe. It applies from 16 October 2025 in most residential zones if the design meets every listed standard.

How big can a granny flat be without a planning permit in Victoria?

From 15 October 2026, a small second dwelling can be up to 80 square metres. It normally needs no planning permit in the residential zones on a lot of 300 square metres or more, unless another control applies. It still needs a building permit.

Can a granny flat be subdivided onto its own title?

No. A planning permit cannot be granted to create a separate lot for land containing a small second dwelling. Two full dwellings with a planning permit can usually be subdivided into two lots.

Can anyone live in a small second home?

Yes. There are no restrictions on who can live in a small second dwelling. If it is rented, Victoria's rental laws and minimum standards for rental properties apply.

Sources

Update log

  • : First published. Checked against Planning Victoria pages on the Townhouse and Low-Rise Code, Amendment VC288 and small second homes (updated 15 October 2026).

General information only. It does not take your objectives, financial situation or needs into account, and it is not financial, credit, legal or tax advice. Citadel Developments is a brand of Citadel Agency, which holds estate agent's licence 092247L. Neither holds an Australian Credit Licence, and we do not arrange finance. Any figures in this article are general patterns, not quotes or forecasts. Laws and lender policies change, so confirm the current position with a licensed professional before you act on anything here.

Keep reading.

The eight steps, start to finishAll articles

Ready to talk about your own build?

A few quick questions, about a minute. Then we call you to talk it through.

Get startedContact us(03) 9494 3151